Wednesday 18 March 2015

Our Current Backload availability

To see all our current upcoming routes click the below link
https://www.europeanrelocationservices.co.uk/upcomingroute.html
We are now are operating since 2017 as  European relocation services
(#Haulage #Logistics #light haulage #Business #Sme #Family business #nationwide coverage #pallets   #partloads #fullloads   )
http://clark-trading.blogspot.co.uk/2015/07/blog-post_92.html ( We are Clark trading )
And Proud to support Dove House hospice
http://clark-trading.blogspot.co.uk/2014/01/dove-house-hospice.html
Routes and Back load sheet

And for your peace of mind check out our feedback here which we are very proud of

Please note all routes are also along route or within apx 25 miles of Route
(Where we are going and how we can help you )
As we update this often 
 (It is worth popping by daily I likely will have added several  new routes )

I am no longer updating this page please go to our website

https://www.clarktradingandlogistics.co.uk/our-upcoming-routes/
Our Current Backload availability for our luton/s ( apx when empty 750 cubic feet 19.3 cubic metres )
New Routes
New Route 
Edited 02/03/16
2016 

23/03/16
Hull to Lancaster ( empty luton)
25 or 26 March
France to UK route
Bordeaux region/area towards Hull./ Yorkshire


So Places along the route e.g. Paris or Dover etc.







18/03/16 
Hull to Goole / Howden around noon 
Then Doncaster either towards Hull or other areas of Yorkshire or north / South 

New route added for our luton while it is France
On the 8th March 
Caen area of Normandy toward Paris there is space for a load

There is a space on today's route to Grimsby from Hull  (01/03/16) around noon

11/03/16
11/03/16 Halifax area and empty Luton returning to the Hull area

12/03/16
Hull to York

Warton/ Lancaster ( m6 area ) or along the route towards the A66  towards Hull /Yorkshire  
07/03/16
Hull to Wellingborough empty Luton THIS ROUTE IS NOW FULL
08/03/16
Normandy France

Caen  region towards Hull /Yorkshire or along the route 
Other load options on this route include the Paris region 
or the likes of Dover  THIS ROUTE IS ALSO FULL 

04/03/16
Hull to Bridlington / East Yorkshire coast along the A165 or Scarbrough

28/02/16
Hull 2 York / Malton  area
and then York / Malton area to other areas of Yorkshire or North/ south or Back towards Hull
Jumbo Sprinter

New route added
28/02/16

Wednesbury
West Midlands ( near Walsall ) Empty Luton towards Hull Yorkshire


25/02/16
Within France route
Between
Le Vivier, LongrĂ©, France and Pierre-de-Bresse, France

21/02/16

Hull to Chester
Empty Sprinter revised to Lwb Luton


early 22/02
Empty Jumbo sprinter Revised 2 Luton Van 
 Hull to Workingham RG40 general area / Goole area towards London region
or Hull to Goole (first thing ) unloading early in Goole area

24/02 OR 25/02
France return leg empty to UK via Calais or Dunkirk
from
La Rochelle general area or along route
I am pleased to announce that this route is now fully booked 
----------------------------------------------------------------------------------------------------------------
New Routes
New Route 
18/12/15
France back to UK 
Rennes / Brittany region   area to Hull / Yorkshire 
Jumbo Sprinter 4.5 m load bay
December 
Either Wednesday afternoon 2nd or Thursday 3rd
Toulouse (France ) area to the UK  

November

30/11/15
Hull to Plymouth (Morning ) Now 29th 
Pontefract area to Hull area ( afternoon /evening ) now 29th 
Added 16/11/15 @10:38
Hull to Kendal ( morning ) Full 

23/11/15
Hull to Peterborough empty ( Morning )
Afternoon 
Horncastle to Hull or Yorkshire / areas along the route  

21/11/2015
Hull empty to the Huntingdon PE29 area in the Morning
Afternoon York area towards Hull or other areas of Yorkshire

19/11/15
Hull area or along route to Thornhill north of Dumfries empty Luton  
Malton or york area towards Hull or other areas of Yorkshire ( afternoon )

16/11/15
Uk to France
2 vans both empty from Hull via Dunkirk the Brest area of France  ( apx 1500 cubic feet  between them ) 

October

29/10/15
Aberdeen South bound towards Hull/Yorkshire ( or along the route )

28/10/15
Hull empty in the morning to Lincoln

23/10
Lincoln to Hull or other areas of Yorkshire or Lincolnshire or loads on route (morning )
22/10/15
Hull to Wirral empty luton (loading in the afternoon)
17/10/15
Hull empty to Pontefract area ( must be empty by 07.00) WF8 area
17 or 18th (may change ) (flexible )
Exeter area north bound empty 700 cubic feet luton back towards Hull / Yorkshire ( will pass Bristol )

16/10/15
Hull empty to the Leeming area (yorkshire ) (morning )
Afternoon empty from Shrewsbury area northbound towards Hull / Yorkshire


14/10/15
Hull to York ( must be empty by 09:00)
York area back towards Hull or towards other areas of Yorkshire from York / along the route
Edited now
York To Scarborough or along that route A64  (afternoon
And then
Scarborough towards Hull area

07/10/15
Afternoon
Empty from Hull to Chelford area (Cheshire ) ( sk11 ) must by empty by 4pm

04/10/15
York To Hull East yorkshire or other Parts of Yorkshire

03/10/15
Hull to Wallasey (Wirral ) Empty (Liverpool area/Merseyside ) M62

September

26/09/15
Hull to Grimsby empty
Birmingham northbound towards Hull /Yorkshire or along the route

24/09/15
Part load space
Scunthrope to Hull Early afternoon

23/09/15
Hull Empty to Cambridge in the morning

16/09/15
Scarborough towards Hull area /East Yorkshire other areas of Yorkshire (afternoon)
15/09/15
Hull to Scunthrope

08/09/15
Hull empty to Scunthrope in the afternoon
09/09
Then Milton keynes to Hull /Northbound M1 towards Hull /Yorkshire afternoon

07/09/15 
York area towards Either Hull or other areas of Yorkshire / North or south bound from York nationwide

05/09/15 (possible 06/09) Edited now 11th September
Hull Empty to Nottingham (Am )
Leeds towards Hull or other areas of Yorkshire / Uk

02/09 now the 3rd
 London Sw1x (Belgravia ) to Hull / Yorkshire in the afternoon

01/09/15
(Morning ) Hull To Birmingham empty (loading Birmingham ) or along route towards Birmingham

August

28/08
Near Croydon from Hull (empty running down to load so must be empty by 8am )
Scarborough back towards Hull Yorkshire coast or other areas of Yorkshire 

25/08/15
York area towards Either Hull or other areas of Yorkshire / North or south bound from York nationwide
24/08/15
Hull to Grimsby empty in the Morning
Cleethorpes to Hull or other areas of UK or Lincolnshire/Yorkshire
Cleethorpes /Grimsby to York
Nelson Lancashire back towards Hull

Today 18/08/15
Lincoln towards Hull/Yorkshire

20/08/15
Early morning empty to Malton from Hull Empty by 08:30 to load in area


13/08/15
London (Empty Luton ) - Hull


-----------------------------------------------------------------------------------------------------------------------

Routes 

23/03/15
from Nottingham towards Hull Yorkshire
Via Grimsby 
Limited availability on this route completed 

25/03/15
From Hull/Yorkshire or anywhere along route towards Plymouth
Updated
We will be running from York towards Worcester on wards to Plymouth on the 25th march  
There is load availability along this stage ad on wards so any back loads along this stage of the route or others
Completed 

Limited Availability left on this route ROUTE COMPLETED 

26/03/15 and 28/03/15
From Lincolnshire towards Hull Yorkshire

26/03 Lincoln COMPLTED
28/03 Grimsby COMPLETED

27/03/2015 
Empty to Waltham abbey Essex Completed 

31/03/2015

Empty Towards Hull/Yorkshire From N1 London NOW FULL Completed 

NEW ROUTE 
12/04/15
Yarm nr Middlesbrough Towards Hull/Yorkshire empty Fully booked completed 

13/04/2015
We are running from Hull to Cory north of Inverness loads along route empty 600 cubic feet
(places like Newcastle Edinburgh or Glasgow  Aberdeen etc) Fully booked completed 

Routes A1 or M6 upwards
14/04/15 (updated) 
Harrogate Most directions north/south towards Hull etc Completed

New route 
22/04/2015
Hartlepool empty towards Hull/Yorkshire or up North COMPLETED

New route
4/04/15
Preston Lancashire towards Hull/Yorkshire Completed 

NEW ROUTE LIVE 
Empty from near Turin Italy to UK (Hull ) (route options Include parts of Belguim,France,Germany,Italy,) via Dover route 14/5/15

Numerous route options
Turin area all the way back load or stage multi drop routes and the likes

I have about 300 cubic feet empty on the way out
Hull- Lincoln Empty
Lincoln to Dover 300 cubic spare

Calais To Turin same route as in bound to UK 300 Cubic   completed 

Sunday the 17th May 
Bristol to Hull  ( New live Route ) 

NEW ROUTE 
LIVE 
24/04/15 
Lincoln Empty luton towards Yorkshire or North or South completed 


NEW ROUTE 
20/04/15
Goole/Howden area to all other areas of Yorkshire or Hull completed 


Hull to Norwich Empty Must be unloaded no later than 08:30
16/04/15 Lincoln North or south Bound Empty Luton completed 


New route  28/04/15 LIVE 
Glasgow area loading within a 100 mile radius of Glasgow South Towards Yorkshire or south (Empty Luton van) full completed 

New Route 24/05/15 LIVE 
Empty from Morcombe Lancashire towards Yorkshire/Hull  

23/04/15  LIVE 
York area Towards Hull  Route Full Same day Scarbrough area to Hull area  completed

04/05/15 Live 
York area towards Hull Empty  completed

05/05/15 Live 
Hull to Nottingham area empty  completed

09/05/15
Newcastle empty southbound towards Hull in the Evening 600 cubic feet 

New route 23/05/15
Great Missenden ( Watford area )

Late 24 (collect for 24/05) or Early 25th 
South From Hull area To Croydon Southern London region  25/05/15
Doncaster Towards Hull or from Doncaster area onwards North or South or to other areas in Yorkshire  (Doncaster leg full )
New leg added 
From Newton And Llallwchairion Wales towards Hull/Yorkshire 


New route added 26/05

And Empty from Hull to Doncaster 


Filey (Scarborough or Bridlington area onwards north or south or towards Hull /Lincolnshire 


29/05/15
Hull To Coalville area Empty
Doncaster towards Hull or Doncaster area north or south or towards other parts of Yorkshire

13/06/15
Hull towards Driffield Early empty (loading in Driffield )
Sheiffield Towards Hull or Sheffield area north or southwards or to other parts of Yorkshire

27/05/15 Edited now on 28/05/15
Hull To Leyland Empty
New Route added for 28/05 (Afternoon ) Shildon DL4 area  towards Hull /Yorkshire


02/06/15
Hull to Melton mowby empty Early
Rotherham Towards Hull or Rotherham area north or south bound or towards other areas of Yorkshire Full
Now
Rotherham to Manchester (afternoon )
Manchester to Hull (apx 400 cubic feet spare / #part load ) (Afternoon )

27/05
Hull to Doncaster

New routes for 1/06/15
Hull to Malton area (Loading in  Malton)

Y061 area  near A19(/York Area  ) Towards Hull or north or southbound from York Area / Towards other areas of Yorkshire 

NEW ROUTE
30/05
Empty from Hull to Bradford area (Loading wf15)

New route added for 3/06/15
Hull to Soilhull  Empty Luton 600 cubic feet

Then York to Manchester (Empty )
400-500 Cubic feet spare back from Manchester to Hull 

York towards Hull or York area north or South bound/ Towards other parts of Yorkshire 

New route
Sunday 7th June 2015

Sheffield area (Empty Luton ) either towards Hull or from Sheffield area north or south bound / Towards other areas of Yorkshire full Due to running on to Europe route See It below 

06/06/15
Hull to Alferton Debryshire

New route
04/06/15
Hull To Hyde area of Manchester empty
Part load space 300-400 cubic feet spare back to Hull

New routes for 05/06/15
Hull to Middlewich This stage is Full 
Then Market Rasen Lincolnshire onwards to Hull or Other areas of Lincolnshire or Yorkshire
(May become Hull to Market Rasen to Hull so need something either way let me know we may be able to help ) has now become Hull 2 Market Rasen area apx 550 Cubic feet spare 5 pallets
And/or North- south bound from Market Rasen 


13/06/15
Sheffield via Dover to France near the Swish Boarder /Geneva
( Saint-Genis-Pouilly )
Via Belguim and Germany NOW FULLY BOOKED

Further new Route
Cowley OX4 /Oxford or Oxfordshire northbound towards Yorkshire 19/06

new Route
21/06

Northbound from Southampton towards Yorkshire /Hull
Or To the Isle of Wight /south coast
Or across to the Eu

New routes for the 16th June
Hull Empty to Bridlington (First thing in the morning ) (600 cubic feet spare )
And then

York To Towards Hull or York Area North or southbound / or York Towards Other areas of Yorkshire 
Revised
Now with apx 450-500 cubic left


New Route 26/06

Sutton in Ashfield Empty back towards Hull/Yorkshire
And or North/South Bound

11/06/15
Empty to York (Morning )

Then Empty from Scarborough towards Hull or North or Southbound from the Scarborough area 

10/07/15
Empty from Hull to Selby

And then York Towards Hull or North or south bound from the York area 

13/06/15
Apx 400 cubic feet spare
Aberdeen to Hull/Yorkshire

18/06/15
Hull to Worksop (Empty ) (600 cubic feet ) (loading in Worksop )
then
Northbound

Heathfield

East Sussex TN21
towards Hull/Yorkshire 



11/07 2015 
Hull Yorkshire to Lausanne Switzerland along the Shore of lake Geneva 
Via Dover 
European route 
Via Either Calais or Dunkirk  Running thought the EU on the 12/07 ( France- Belgium- Luxembourg- Germany- Switzerland )
Loading in Switzerland 13/07 FULL FULL 



27/06/15 
Hull to Manchester (Empty (loading in Manchester)
29/06.15 
(France) 
Corcy 02600 to UK (Empty ) any where along a north bound route back to Hull/Yorkshire 

near Paris or Reims areas of France apx  full



24/06/15 
Empty Luton Northbound to Yorkshire from SW1 area of London 

New route 08/07/15 
Empty from Hull to chesterfield in the morning 
empty from Bridlington
towards Hull or towards other areas of Yorkshire

01/07/15 
Bolton towards Hull

New routes July 2015

06/07/15
London towards Hull/Yorkshire (From Sw1 area of London )

24/07/15
Banbury (Oxfordshire near M40 area ) North Bound towards Hull/ Yorkshire
And Oxfordshire area to Worksop
Now Leeds to Hull


04/07/15
Hull to Ferrywell County Durham (near A1M Middlesbrough area ) Empty
Unloaded no later than 10am

7/07/15
Hull to York area empty no later than 09:00 (loading york area ) 600 cubic empty
Ideally along route A1079

York area towards any location in Yorkshire or North or South bound  (afternoon empty 600 cubic feet )
Beverley area same as above (half way between both apx)

New route added due to a 2nd van joining the fleet

10/07/15
Hull Empty towards Southend on sea area (600 cubic feet )

York to Hull area or other areas of Yorkshire or north south from the york area

apx 16/07/15
(dependant on van arrival back due to possible delays in #Europe )
Grimsby to all directions Empty Luton van ( Fleet van 01)

09/09/15 
Northallerton area in the afternoon 
to Hull area or other areas of Yorkshire or north south from the  Northallerton area


Here yet a further new route (van 2 may have this one ) 
Hull to Gloucester (empty ) to load
Selby to Hull or Selby to other areas of Yorkshire or north southbound Uk

New routes for the 28/07
Empty Luton van

Middlesbrough towards Hull (/Yorkshire ) afternoon period 


Afternoon
New route 22/07

Hull empty to Fareham near Southampton  

New routes (August )
6th August
Hull, empty to York in the Morning
Empty South bound from Edinburgh in the Afternoon Towards Hull/Yorkshire
Either A1 Berwick route or M6-A66 depending on return loads so either route
Currently  

17/07/15
Hull to Manchester on a empty Luton
York area towards Hull

24/07/15
Hull to Kilmarnock empty luton van (1 man crew on this one )

New route
25/07/15

Halifax back towards Hull or Halifax North/southbound or Halifax towards other areas of Yorkshire 
moved forward 1 day 24/07
So route is now
Halifax to Kilmarnock 24/7

New routes
25/07

Birmingham to Hull/Yorkshire empty Luton 

01/08/15
Driffeild area towards Hull or other areas of Yorkshire North/South

21/07/15
Leeds area Towards Hull

23/07
Banbury to the Hull/Yorkshire area empty Luton

London routes for next week with space on the return leg to Hull 27/07 and 29/7
29/7 London return load booked up as far as leeds ( possible 200 cubic feet spare )
Now 29/07 Leeds to Hull
I now have a second van in London tomorrow with space to on the return leg towards Hull/Yorkshire 
Morning 29/07 Leeds from Hull 

New route 2nd August 
Bradford Empty towards Hull 

23/07 
Harrogate to Hull area 

3/08/15 
Hull empty Luton must be empty by 07:00  to York 
London North bound towards Hull / Yorkshire along the route  (SE17 )

31/07
Gainsborough from Hull 

Littlehampton (West Sussex ) to Yorkshire 

31/07 
Hull to Cheltenham

Grimsby to Hull   

30/07 
Hull to York 
Driffield to Hull 

Thanks 

Thanks  
Send me a Email @ Clark395@hotmail.co.uk 
Or Drop Lynne an Email @ Clark396@hotmail.co.uk 



















































Key 
Active Routes = Live 
Completed routes = Completed 
Active route booked up = Full
I would like to reassure every one with have plans in place to minimize any disruption caused up the up coming threat of strike action in France details here  (June/July 2015 )

 The Next Scottish route/s
6/08/15
Edinburgh
See above
24/07/15
Kilmarnock
See above



#Pallets > http://clark-trading.blogspot.co.uk/2015/09/blog-post_31.html#links
#Equipment > http://clark-trading.blogspot.co.uk/2015/09/blog-post_74.html#links
# Ambient >  http://clark-trading.blogspot.com/2015/09/ambient-food-deliveries.html

No comments:

Post a Comment